概要

Believing in hard work as an honest person, I want to work with an organization providing healthy environment and opportunity to work as team member where I can utilize my knowledge and professional skills with my full devotion.

项目

Project of Sorting through Barcode-Conveying System
Commisioning Of New Endurance Pulley Wheel Machine
Commissioning Of Uniformity And Dynamic Machine

工作经历

公司标识
HOD Production
Synergy Corporation
Aug 2022 - 代表 | Karachi, Pakistan

1-Managing Production, Planning and timely deliveries.2-Responsible for production output, product quality and timely dispatch.3-Investigate all the issues related to the process and find root cause to avoid in future.4-Schedule maintenance on all machines.5-Ensure cleanliness of plant throughout the process.6-Conduct meetings to discuss weekly/monthly plan (production, and dispatch) with director.7-Monitor wastages (time and material) to make process efficient.8-Make changes in production plan to achieve production targets.9-Responsible to create require BOMs for different job orders and also correctness of BOM.10-Material handling 11-Inventory audit of material in production.12-Minimizing Overtime.13-Conducting both regular and technical trainings.14-Weekly CAR meeting attending with different dept heads to discuss inhouse/on-site issues to find problem and take corrective action against it.15-Design new canopies of gensets as per SAE standards and optimize each design with respect to cost saving.

公司标识
Deputy Manager Quality Assurance
Omar Jibran Engineering Industries
May 2021 - May 2022 | Karachi, Pakistan

1- Manage through QC team to ensures that the products and services meet all necessary requirements before they reach the consumer.2- Manage to inspect the final product to make sure it has been built with compliance to legal standards and meets customer expectations.3- Manage creation and maintaining of all quality documents.4- Direct and conduct 100 audit results, Inspect and tag all incoming raw materials.5- Train and monitor all quality personnel with regards to quality issues and maintain all Training records.6- Conduct different studies and RCA for analysing the problem in product and by doing CPA to counter problem.7- Coordinate with OEMs to implement Engineering changes required in specification of parts.8- Involve QC and other dept teams in improvement activities(Kai-zen) for betterment of products.9- Daily monitoring data and analysis to control internal rejection by implementation of Quality systems and QC tools.10- Assure the viability, functionality and effectiveness of essential tools, jigs and fixtures used in house for production.

公司标识
Manager Quality Control
MBI Industries (Pvt) Ltd
Jan 2021 - May 2021 | Karachi, Pakistan

1- Manage QC activities during regular production as well as new part development. 2- Develop strategies with Production team for ensuring and maintaining Quality standards for products. 3- Training QC department and implement different quality checks for defect free product. 4- Counseling QC team regarding daily basis quality issues for the betterment of product. 5- Correspondence with OEMs regarding new under development parts as well as Quality issues in line rejection at their Plant.

公司标识
Production & Quality Control Engineer
General Tyre and Rubber Company
Sep 2016 - Jan 2021 | Karachi, Pakistan

1- Manage all the testing activities of finish product to ensure defect free customer supply. 2- Evaluate the testing results on daily basis to develop improvement plan if required. 3- Plan and conduct Quality studies to ensure results as per OGPS. 4- Training and evaluation of sub-ordinate and operators for the testing machines operations. 5- Active role in the commissioning of New testing Machines and correspondence with chinese engineer to successfully installation of machines.6- Making SOP, WI, MOP for the machines and working on layout of machines for its operation.7- Carry out Internal Audits to verify Adequacy, compliance and effectiveness of Quality Management System ISO 9001-2015 and Environmental Management System ISO 14001-2015. 8- Address preventive and corrective action related to customer complaints, customer returns and warranty. 9- Prepare Calibration Plan for the testing equipments and tools and guages. 10- Resolve the machines\'s issue with the engineering teams and also correspondence with Chinese engineer if required. 11- Fully participate in development of new products and modification/improvement of existing products. 12- Coordinate with process teams in finding the root cause of defects/complaints.

公司标识
Sr. Executive Engineer (Production Engineer)
Aisha Steel Mills Limited
Aug 2014 - Aug 2016 | Karachi, Pakistan

1- Being Shift Engineer to manage all activities of plant and specially Cold Rolling and Skin Pass Plant. 2- Handling of require resources e.g. manpower and utilities in order to smooth production in overall the shift. 3- Correspondence with the engineering teams to resolve plant issues. 4- Conduct training and awareness sessions related to Quality issues, safety issues and customer complaints for operators. 5- Maintain record and reporting to Manager related to Plant issues and downtime and prepare monthly and daily wise reports of it.6- Monitoring and analyze the QC reports regarding the defects on daily basis to take necessary steps for controlling of it. 7- Monitoring of consumable items and reporting to Manager. 8- Utilize effectively manpower to minimize downtime and increase productivity of Machine.

公司标识
Trainee Engineer (Production Planning And Control)
Aisha Steel Mills Limited
Apr 2014 - Aug 2014 | Karachi, Pakistan

1- Maintain record of whole plant Production on ERP system on daily and monthly basis. 2- Prepare a commulative daily wise Production Status Report of whole plant and release to Upper Management. 3- Maintain record of Finish Good Product on daily wise and release daily and monthly reports to Upper Management. 4- Prepare a Production Plan from forecasting sale report and release to Production departments. 5- At the end of every month, check and manage inventory of Raw Material, IN Process and Finish Good.

公司标识
Intern
Pakistan Steel Mills
Jul 2012 - Aug 2012 | Karachi, Pakistan

学历

NED University of Engineering & Technology
硕士, 科学硕士学位, Master in Engineering Management (Industrial Management)‎
Project Management, Quality Management, Operational Management
CGPA 3.5/4
2016
NED University of Engineering & Technology
学士, 理工学士, Bachelor of Mechanical Engineering‎
Thermodynamic, Production Engineering, Material Engineering
CGPA 3.4/4
2014
Govt Dehli College
中级/A级, , Intermediate in Pre Engineering‎
Pre Engineering
等级 A+
2009
Aminah Secondary School
大学入学/0级, , Matriculation in Science‎
Science
等级 A+
2007

技能

熟练 Administration Knowledge
中级 Analyze Information
中级 Analyze Problems
熟练 Communication for Development
熟练 Communication Skills Listening
中级 Customer Handling Skills
中级 Design for Manufacturing
中级 Engineering Drawing
熟练 Interpersonal Skill
熟练 Labor Management
初学者 Machine Maintenance
熟练 Post-production Supervision
熟练 PPC Command
初学者 Pro E
熟练 Problem-solving
熟练 Production Support
熟练 Quality Assurance
熟练 Quality Control
初学者 Strategic Management
中级 Strong Organizing and Planning Skills
熟练 Supervision Skills
熟练 Team Management
中级 Technical Skills

语言

熟练 乌尔都语
中级 英语